Millwork manufacturer · Manufacturing · Built and running

A hundred bid invitations a day, read and ranked before anyone opens them.

100 bids a day, sorted

Every invitation read as it arrives, added to the bid schedule and ranked against the plant's own criteria.

The organization

The same millwork manufacturer in Rhode Island, a few months after the quoting system went live.

What was happening

With quoting capacity no longer the constraint, intake became one. Around a hundred bid invitations arrived every day by email. Nobody could read them all, so good opportunities were missed and the ones that got answered were whichever happened to be on top of the inbox.

What we looked at

What made a bid worth pursuing for this plant: project size, location, general contractor, timing and scope. Most of it was already being judged by the estimator in a few seconds per invitation. The time went into opening and reading them.

What we built

A system that reads each invitation as it lands, pulls out the details that matter, adds it to the bid schedule and ranks it against the plant's own criteria. The estimator still decides what to bid. The system decides what reaches the estimator first.

How it runs: A hundred bid invitations a day, read and ranked before anyone opens them.
How it runs, simplified. The system lives inside the tools the organization already uses.

What changed

The estimator reviews the best forty or fifty a day instead of all hundred, and nothing worth bidding gets buried. Together with the quoting system, the plant now controls which work it takes on instead of answering whatever arrives first.

More delivered work

Start with a conversation.

Tell us where the operation is constrained. We will tell you what is worth doing, what is not, and whether an assessment makes sense.